ISR including all expected effects

    XMLWordPrintable

    Details

    • Type: Milestone
    • Status: Unplanned
    • Priority: Major
    • Resolution: Unresolved
    • Affects Version/s: None
    • Fix Version/s: X16
    • Component/s: Planning
    • Labels:
    • Milestone Level:
      4

      Description

      This milestone will require identifying the expected effects.

        Attachments

          Activity

          Hide
          krughoff Simon Krughoff added a comment - - edited

          The RFC for what to include was adopted (RFC-129), but I ran out of time to implement them all in W16. This is planned in the current sprint and will be completed in X16.

          Impact of delay:
          There is minimal impact inside DM since HSC uses their own versions of all of these. There greatest impact is with the validation datasets work since Hsin-Fang is trying to reduce DECam data using the LSST stack and cannot use a vanilla ISR to do crosstalk correction yet.

          Show
          krughoff Simon Krughoff added a comment - - edited The RFC for what to include was adopted ( RFC-129 ), but I ran out of time to implement them all in W16. This is planned in the current sprint and will be completed in X16. Impact of delay: There is minimal impact inside DM since HSC uses their own versions of all of these. There greatest impact is with the validation datasets work since Hsin-Fang is trying to reduce DECam data using the LSST stack and cannot use a vanilla ISR to do crosstalk correction yet.
          Hide
          swinbank John Swinbank added a comment -

          The original aim of this milestone was for it to be reflected in a redrafted LSE-180 (Photometric Calibration Plan), but production of that document has been on hold because of a lack of available effort during the replan. However, the material in LDM-151 likely constitutes an adequate answer to this milestone.

          Show
          swinbank John Swinbank added a comment - The original aim of this milestone was for it to be reflected in a redrafted LSE-180 (Photometric Calibration Plan), but production of that document has been on hold because of a lack of available effort during the replan. However, the material in LDM-151 likely constitutes an adequate answer to this milestone.

            People

            Assignee:
            krughoff Simon Krughoff
            Reporter:
            krughoff Simon Krughoff
            Watchers:
            John Swinbank, Simon Krughoff
            Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

              Dates

              Created:
              Updated:

                Jenkins

                No builds found.