XMLWordPrintable

    Details

    • Type: Key Metric
    • Status: Closed
    • Priority: Major
    • Resolution: Won't Fix
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: Planning
    • Labels:
      None
    • Metric Value:
      108
    • Metric Unit:
      TFLOPS

      Description

      All DRP + AP pipelines.

      LDM-138|Output|F4.

        Attachments

          Issue Links

            Activity

            Hide
            swinbank John Swinbank added a comment -

            Note that the description of "DR1" may be misleading. Per discussion with Kian-Tat Lim, this metric specifically refers to the first annual data release, not the initial release after 6 months. Since this release happens 6 months after the previous release, we assume a 9 week processing window (rather than the 18 weeks available for other annual releases).

            Show
            swinbank John Swinbank added a comment - Note that the description of "DR1" may be misleading. Per discussion with Kian-Tat Lim , this metric specifically refers to the first annual data release, not the initial release after 6 months. Since this release happens 6 months after the previous release, we assume a 9 week processing window (rather than the 18 weeks available for other annual releases).
            Hide
            lguy Leanne Guy added a comment -

            No longer aligned with DM V&V plans.

            Show
            lguy Leanne Guy added a comment - No longer aligned with DM V&V plans.

              People

              Assignee:
              swinbank John Swinbank
              Reporter:
              swinbank John Swinbank
              Watchers:
              John Swinbank, Leanne Guy
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved: