Uploaded image for project: 'OBSOLETE DM Long-range Planning OBSOLETE'
  1. OBSOLETE DM Long-range Planning OBSOLETE
  2. DLP-332

Image preparation time for web UI

    XMLWordPrintable

    Details

    • Type: Key Metric
    • Status: Closed
    • Priority: Major
    • Resolution: Won't Fix
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: Planning
    • Labels:
      None
    • Metric Value:
      0.5
    • Metric Unit:
      second

      Description

      The image needs to be prepared in the server side (convert to PNG or other image format) before it is displayed at the WEB UI. This is for the time it takes to have it ready for display.

      This is achieved in cycles S17, S19, S20.

        Attachments

          Issue Links

            Activity

            Hide
            xiuqin Xiuqin Wu [X] (Inactive) added a comment -

            The progress of this KPM is measured and tracked by these three epics.

            Show
            xiuqin Xiuqin Wu [X] (Inactive) added a comment - The progress of this KPM is measured and tracked by these three epics.
            Hide
            lguy Leanne Guy added a comment -

            No longer aligned with DM V&V plans.

            Show
            lguy Leanne Guy added a comment - No longer aligned with DM V&V plans.

              People

              Assignee:
              xiuqin Xiuqin Wu [X] (Inactive)
              Reporter:
              xiuqin Xiuqin Wu [X] (Inactive)
              Watchers:
              Leanne Guy, Xiuqin Wu [X] (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:

                  Jenkins Builds

                  No builds found.