Uploaded image for project: 'OBSOLETE DM Long-range Planning OBSOLETE'
  1. OBSOLETE DM Long-range Planning OBSOLETE
  2. DLP-352

Metrics of Interest integrated in running stack or post-tests

    XMLWordPrintable

    Details

    • Type: Milestone
    • Status: Closed
    • Priority: Major
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: F17
    • Component/s: Planning
    • Labels:
      None
    • Milestone Level:
      4

      Attachments

        Issue Links

          Activity

          Hide
          frossie Frossie Economou added a comment -

          We have demonstrated in-task metric capture using jointcal as an example. Metrics are saved as specified in the verification framework ( code: https://github.com/lsst/verify doc: https://sqr-019.lsst.io ) and can be dispatched to SQuaSH using post_qa (a shim until the Butler can support put of metrics)

          Show
          frossie Frossie Economou added a comment - We have demonstrated in-task metric capture using jointcal as an example. Metrics are saved as specified in the verification framework ( code: https://github.com/lsst/verify doc: https://sqr-019.lsst.io ) and can be dispatched to SQuaSH using post_qa (a shim until the Butler can support put of metrics)

            People

            Assignee:
            frossie Frossie Economou
            Reporter:
            frossie Frossie Economou
            Watchers:
            Frossie Economou
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

              Dates

              Created:
              Updated:
              Resolved:

                Jenkins

                No builds found.