Details
Attachments
Issue Links
- relates to
-
DM-8477 SQuaSH in-task metric capture
- Done
Activity
Field | Original Value | New Value |
---|---|---|
Workflow | jira [ 21156 ] | DM Long-range Planning Workflow [ 24320 ] |
Milestone Level | 4 [ 11503 ] |
Resolution | Done [ 10000 ] | |
Status | Open [ 1 ] | Closed [ 6 ] |
We have demonstrated in-task metric capture using jointcal as an example. Metrics are saved as specified in the verification framework ( code: https://github.com/lsst/verify doc: https://sqr-019.lsst.io ) and can be dispatched to SQuaSH using post_qa (a shim until the Butler can support put of metrics)