Milestone 3 Fiber Delivery Plan Ready

    Details

    • Type: Milestone
    • Status: Reopened
    • Priority: Major
    • Resolution: Unresolved
    • Affects Version/s: None
    • Fix Version/s: F16
    • Component/s: Planning
    • Labels:
      None
    • Milestone Level:
      4

      Description

      REUNA/Telefonica provide plan to install fiber bundle from La Serena to Santiago on the 3T link, and secondary path via existing coastal fibers, including tests by Telefonica and Reuna/AURA

        Attachments

          Activity

          Hide
          rlambert Ron Lambert added a comment -

          The fiber is installed by the 3T and has been measured on the numerous spans between La Serena and Santiago.
          The local loops will be completed in February and Reuna can then carry out their own measurements and tests for a period of 6 months.

          Show
          rlambert Ron Lambert added a comment - The fiber is installed by the 3T and has been measured on the numerous spans between La Serena and Santiago. The local loops will be completed in February and Reuna can then carry out their own measurements and tests for a period of 6 months.

            People

            • Assignee:
              rlambert Ron Lambert
              Reporter:
              rlambert Ron Lambert
              Watchers:
              Jeff Kantor, Ron Lambert
            • Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

              Dates

              • Due:
                Created:
                Updated:

                Summary Panel