Uploaded image for project: 'OBSOLETE DM Long-range Planning OBSOLETE'
  1. OBSOLETE DM Long-range Planning OBSOLETE
  2. DLP-529

DMTC-0100-3200 Base - Archive Network Functional - 2 x 100 Gbps

    XMLWordPrintable

    Details

    • Type: Milestone
    • Status: Resolved
    • Priority: Major
    • Resolution: Won't Do
    • Affects Version/s: None
    • Fix Version/s: F19
    • Component/s: Planning
    • Labels:
    • Milestone Level:
      2

      Description

      This milestone represents the availability of both sides of the 100 Gbps ring connection Santiago and Miami as well as the 100 Gbps path connecting Santiago and Boca Raton. Both the primary and secondary 40 Gbps La Serena - Santiago links will be available by this time.

        Attachments

          Issue Links

            Activity

            There are no comments yet on this issue.

              People

              Assignee:
              jkantor Jeff Kantor
              Reporter:
              klong Kevin Long
              Watchers:
              Kevin Long
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:

                  Jenkins

                  No builds found.