DMTC-0100-3300 LSE-76 DM summit facility interface - Phase 3

    Details

    • Type: Milestone
    • Status: Resolved
    • Priority: Major
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: S15
    • Component/s: Planning
    • Milestone Level:
      2
    • ICD?:
      ICD
    • Flowdown Doc:
      LSE-76

      Description

      LSE-76 is the ICD for the DM to Summit Facility interface. This is an interface defining the physical requirements of DM at the Summit Facility. It is an interface between DM and Telescope & Site.

      At present this appears to be limited to the rack space, power, and cooling required for the Summit-Base network endpoint. The rest of the Summit network is not formally a DM deliverable, though it is part of the integrated LSST network design described in LSE-78.

      The completion of this milestone will reflect the conclusion of an agreement between DM and T&S on the details of the physical requirements, with these details added to LSE-76.

        Attachments

          Activity

            People

            • Assignee:
              gpdf Gregory Dubois-Felsmann
              Reporter:
              klong Kevin Long
              Watchers:
              Gregory Dubois-Felsmann, Jacques Sebag, Kevin Long, Ron Lambert
            • Votes:
              0 Vote for this issue
              Watchers:
              4 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved: