Uploaded image for project: 'OBSOLETE DM Long-range Planning OBSOLETE'
  1. OBSOLETE DM Long-range Planning OBSOLETE
  2. DLP-548

DMTC-0100-4350 LSE-77 DM base facility interface - Phase 3

    Details

    • Type: Milestone
    • Status: Resolved
    • Priority: Major
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: F16
    • Component/s: Planning
    • Milestone Level:
      2
    • ICD?:
      ICD
    • Flowdown Doc:
      LSE-77

      Description

      LSE-77 is the ICD for the DM to Base Facility interface. This is an interface defining the physical requirements of DM at the Base Facility. It is an interface between DM and Telescope & Site.

      The interface primarily concerns itself with space, power, and cooling requirements for the DM equipment for the Base Center and the Chilean Data Access Center.

      The completion of this milestone will reflect the conclusion of an agreement between DM and T&S on the details of the physical requirements, with these details either added to LSE-77 or reflected in other change-controlled documents. In particular, the Base Facility Data Center Design Requirements document, LSE-239 reflects the roll-up of all subsystems' requirements for Base Facility accommodation.

        Attachments

          Container Issues

            Activity

              People

              • Assignee:
                gpdf Gregory Dubois-Felsmann
                Reporter:
                klong Kevin Long
                Watchers:
                Donald Petravick, Gregory Dubois-Felsmann, Jason Alt [X] (Inactive), Kevin Long
              • Votes:
                0 Vote for this issue
                Watchers:
                4 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:

                  Summary Panel