Uploaded image for project: 'OBSOLETE DM Long-range Planning OBSOLETE'
  1. OBSOLETE DM Long-range Planning OBSOLETE
  2. DLP-548

DMTC-0100-4350 LSE-77 DM base facility interface - Phase 3

    XMLWordPrintable

    Details

    • Type: Milestone
    • Status: Resolved
    • Priority: Major
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: F16
    • Component/s: Planning
    • Milestone Level:
      2
    • ICD?:
      ICD
    • Flowdown Doc:
      LSE-77

      Description

      LSE-77 is the ICD for the DM to Base Facility interface. This is an interface defining the physical requirements of DM at the Base Facility. It is an interface between DM and Telescope & Site.

      The interface primarily concerns itself with space, power, and cooling requirements for the DM equipment for the Base Center and the Chilean Data Access Center.

      The completion of this milestone will reflect the conclusion of an agreement between DM and T&S on the details of the physical requirements, with these details either added to LSE-77 or reflected in other change-controlled documents. In particular, the Base Facility Data Center Design Requirements document, LSE-239 reflects the roll-up of all subsystems' requirements for Base Facility accommodation.

        Attachments

          Activity

          No work has yet been logged on this issue.

            People

            Assignee:
            gpdf Gregory Dubois-Felsmann
            Reporter:
            klong Kevin Long
            Watchers:
            Donald Petravick, Gregory Dubois-Felsmann, Jason Alt [X] (Inactive), Kevin Long
            Votes:
            0 Vote for this issue
            Watchers:
            4 Start watching this issue

              Dates

              Created:
              Updated:
              Resolved:

                CI Builds

                No builds found.