Uploaded image for project: 'OBSOLETE DM Long-range Planning OBSOLETE'
  1. OBSOLETE DM Long-range Planning OBSOLETE
  2. DLP-549

DMTC-0100-3800 LSE-78 all LSST network design - Phase 3

    Details

    • Type: Milestone
    • Status: Unplanned
    • Priority: Major
    • Resolution: Unresolved
    • Affects Version/s: None
    • Fix Version/s: F16
    • Component/s: Planning
    • Milestone Level:
      2
    • ICD?:
      ICD
    • Flowdown Doc:
      LSE-78

      Description

      LSE-78 is the LSST Observatory Network Design document. This effectively defines an interface among all the Observatory subsystems cooperating at the Summit and Base (as well as defining the DM data transport Base-Archive).

      The completion of the Phase 3 milestone for LSE-78 will reflect the conclusion of an agreement between DM - the main implementing subsystem - with the other subsystems on the Observatory network plans to a sufficient level of detail to permit implementation to begin.

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                gpdf Gregory Dubois-Felsmann
                Reporter:
                klong Kevin Long
                Watchers:
                Gregory Dubois-Felsmann, Kevin Long, Ron Lambert
              • Votes:
                0 Vote for this issue
                Watchers:
                3 Start watching this issue

                Dates

                • Created:
                  Updated:

                  Summary Panel