Uploaded image for project: 'OBSOLETE DM Long-range Planning OBSOLETE'
  1. OBSOLETE DM Long-range Planning OBSOLETE
  2. DLP-582

End-to-end DRP 3: Raw data to analysis, ComCam level

    Details

    • Type: Milestone
    • Status: Unplanned
    • Priority: Major
    • Resolution: Unresolved
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: Planning
    • Labels:
    • Milestone Level:
      3

      Description

      Start with raw data from ComCam (or a simulation thereof) in an amount expected from ComCam operations. Run through all the DRP steps, generating results at a scientific performance level suitable for validating LSST system performance. Load results into data access services able to handle ComCam operational loads. Analyze results using ComCam-capable SUI tools.

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                ktl Kian-Tat Lim
                Reporter:
                ktl Kian-Tat Lim
                Watchers:
                Kian-Tat Lim
              • Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Dates

                • Created:
                  Updated:

                  Summary Panel