Uploaded image for project: 'OBSOLETE DM Long-range Planning OBSOLETE'
  1. OBSOLETE DM Long-range Planning OBSOLETE
  2. DLP-583

End-to-end DRP 4: Raw data to analysis, survey level

    Details

    • Type: Milestone
    • Status: Unplanned
    • Priority: Major
    • Resolution: Unresolved
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: Planning
    • Labels:
    • Milestone Level:
      3

      Description

      Start with raw data from the LSST Camera (or a simulation thereof) in an amount expected for DR2. Run through all the DRP steps, generating results at SRD performance levels. Load results into data access services able to handle full operational loads. Analyze results using full SUI tools.

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                ktl Kian-Tat Lim
                Reporter:
                ktl Kian-Tat Lim
                Watchers:
                Kian-Tat Lim
              • Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Dates

                • Created:
                  Updated:

                  Summary Panel