Uploaded image for project: 'OBSOLETE DM Long-range Planning OBSOLETE'
  1. OBSOLETE DM Long-range Planning OBSOLETE
  2. DLP-584

End-to-end AP 1: Camera simulation to alerts, minimal level

    Details

    • Type: Milestone
    • Status: Unplanned
    • Priority: Major
    • Resolution: Unresolved
    • Affects Version/s: None
    • Fix Version/s: S17
    • Component/s: Planning
    • Milestone Level:
      3

      Description

      Accept simulated OCS and CCS events. Obtain pixel data from simulated Camera Data System. Execute AP processing at least at a placeholder level (results of correct form). Generate data for alerts but publish only to Level 1 Database. Load results into Level 1 Database.

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                ktl Kian-Tat Lim
                Reporter:
                ktl Kian-Tat Lim
                Watchers:
                John Swinbank, Kian-Tat Lim
              • Votes:
                0 Vote for this issue
                Watchers:
                2 Start watching this issue

                Dates

                • Created:
                  Updated:

                  Summary Panel