Uploaded image for project: 'OBSOLETE DM Long-range Planning OBSOLETE'
  1. OBSOLETE DM Long-range Planning OBSOLETE
  2. DLP-584

End-to-end AP 1: Camera simulation to alerts, minimal level

    XMLWordPrintable

Details

    • Milestone
    • Status: Unplanned
    • Major
    • Resolution: Unresolved
    • None
    • S17
    • Planning
    • 3

    Description

      Accept simulated OCS and CCS events. Obtain pixel data from simulated Camera Data System. Execute AP processing at least at a placeholder level (results of correct form). Generate data for alerts but publish only to Level 1 Database. Load results into Level 1 Database.

      Attachments

        Issue Links

          Activity

            People

              ktl Kian-Tat Lim
              ktl Kian-Tat Lim
              John Swinbank, Kian-Tat Lim
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

              Dates

                Created:
                Updated:

                Jenkins

                  No builds found.