Uploaded image for project: 'OBSOLETE DM Long-range Planning OBSOLETE'
  1. OBSOLETE DM Long-range Planning OBSOLETE
  2. DLP-587

End-to-end AP 4: Camera Test Stand to analysis, survey level

    Details

    • Type: Milestone
    • Status: Unplanned
    • Priority: Major
    • Resolution: Unresolved
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: Planning
    • Labels:
    • Milestone Level:
      3

      Description

      Accept simulated OCS and CCS events. Obtain pixel data at full-frame sizes/rates from Camera Data System test stand. Execute AP processing at SRD level. Generate data for alerts and publish to minimal broker. Perform daily smoke tests. Perform daily raw calibration image processing. Load results into data access services able to handle full operational loads. Analyze results using full SUI tools.

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                ktl Kian-Tat Lim
                Reporter:
                ktl Kian-Tat Lim
                Watchers:
                Kian-Tat Lim
              • Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Dates

                • Created:
                  Updated:

                  Summary Panel