Uploaded image for project: 'OBSOLETE DM Long-range Planning OBSOLETE'
  1. OBSOLETE DM Long-range Planning OBSOLETE
  2. DLP-715

Fundamental centroid and shape measurements

    Details

    • Type: Milestone
    • Status: Closed
    • Priority: Major
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: S14
    • Component/s: Planning
    • Labels:
      None
    • Milestone Level:
      4

      Description

      Per LDM-151 ยงยง5.4.2.8 and 5.4.2.9 centroids are measured for objects detected on coadds using an algorithm derived from SDSS, while adaptive moments are based on the algorithm described by Bernstein & Jarvis.

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                swinbank John Swinbank
                Reporter:
                swinbank John Swinbank
                Watchers:
                John Swinbank
              • Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:

                  Summary Panel