Uploaded image for project: 'OBSOLETE DM Long-range Planning OBSOLETE'
  1. OBSOLETE DM Long-range Planning OBSOLETE
  2. DLP-847

Meet camera DAQ/OCS milestones for FY16

    Details

    • Type: Milestone
    • Status: In Progress
    • Priority: Major
    • Resolution: Unresolved
    • Affects Version/s: None
    • Fix Version/s: F16
    • Component/s: Planning
    • Milestone Level:
      3

      Description

      We will meet FY16 milestones for integrating DM with other subsystems (i.e., DMCS with OCS and CCS), as listed here: https://confluence.lsstcorp.org/display/SYSENG/OCS-CCS-DM+integration+timeline
      and here:
      https://confluence.lsstcorp.org/display/DM/Integration+timeline+summary+for+DM.

        Attachments

          Activity

          Hide
          gpdf Gregory Dubois-Felsmann added a comment - - edited

          With reference to the original "FY2016" milestones on the page https://confluence.lsstcorp.org/display/DM/Integration+timeline+summary+for+DM
          the current status is:

          COMC-2884 (basic CCS-OCS communication, and the like for DMCS): done in April 2017 integration exercise
          COMC-2894 (populate EFD with dummy telemetry, at least from Camera): done in April 2017 integration exercise
          COMC-2904 (OCS-DM-TCS-CCS Start/end of night test): done as key outcome of April 2017 integration exercise (#3)

          COMC-2954 (DM Demonstrates ability to compile and link against the v1 DAQ software): enabled by July 2017 installation of DAQ test stand and software at NCSA, expected to be complete by September 2017

          COMC-2914 (Test of EFD replication under DM device control): deferred by redesign of EFD from verbatim replication to "EFD reformatting / ETL", expected to be demonstrated in S18 cycle

          Show
          gpdf Gregory Dubois-Felsmann added a comment - - edited With reference to the original "FY2016" milestones on the page https://confluence.lsstcorp.org/display/DM/Integration+timeline+summary+for+DM the current status is: COMC-2884 (basic CCS-OCS communication, and the like for DMCS): done in April 2017 integration exercise COMC-2894 (populate EFD with dummy telemetry, at least from Camera): done in April 2017 integration exercise COMC-2904 (OCS-DM-TCS-CCS Start/end of night test): done as key outcome of April 2017 integration exercise (#3) COMC-2954 (DM Demonstrates ability to compile and link against the v1 DAQ software): enabled by July 2017 installation of DAQ test stand and software at NCSA, expected to be complete by September 2017 COMC-2914 (Test of EFD replication under DM device control): deferred by redesign of EFD from verbatim replication to "EFD reformatting / ETL", expected to be demonstrated in S18 cycle
          Hide
          gpdf Gregory Dubois-Felsmann added a comment -

          It is proposed that this milestone be marked complete when COMC-2954 is achieved, with a redesigned/respecified version of the EFD replication test (now EFD reformatting) broken out as a separate integration exercise and corresponding milestone.

          Show
          gpdf Gregory Dubois-Felsmann added a comment - It is proposed that this milestone be marked complete when COMC-2954 is achieved, with a redesigned/respecified version of the EFD replication test (now EFD reformatting) broken out as a separate integration exercise and corresponding milestone.

            People

            • Assignee:
              gpdf Gregory Dubois-Felsmann
              Reporter:
              mgelman2 Margaret Gelman
              Watchers:
              Felipe Menanteau, Fritz Mueller, Gregory Dubois-Felsmann, Margaret Gelman
            • Votes:
              0 Vote for this issue
              Watchers:
              4 Start watching this issue

              Dates

              • Created:
                Updated:

                Summary Panel