  2. DM-10296

Address unresolved issues found in building the AP prototype pipeline

    Details

    • Templates:
    • Epic Name:
      AP_Prototype_Cleanup
    • Story Points:
      50
    • WBS:
      02C.03.00
    • Team:
      Alert Production
    • Cycle:
      Fall 2017

      Description

      There will be some work to do to fix up the prototype alert production system after the initial implementation is finished. This will likely include improving ISR by adding steps or refining others, improving the way the obs packages do the bookkeeping, and wrangling data outputs.

        Attachments

          Container Issues

            Issue Links

            Stories in Epic (Custom Issue Matrix)

            Key Summary Story Points Assignee Status
             
            DM-10297

            Fix "double treerings"

            6 Meredith Rawls Done
             
            DM-10298

            Unmasked "Tape Bump"

            6 Meredith Rawls Done

              Activity

                People

                • Assignee:
                  mrawls Meredith Rawls
                  Reporter:
                  krughoff Simon Krughoff
                  Watchers:
                  John Swinbank, Simon Krughoff
                • Votes:
                  0 Vote for this issue
                  Watchers:
                  2 Start watching this issue

                  Dates

                  • Created:
                    Updated:
                    Resolved:

                    Summary Panel