Uploaded image for project: 'Data Management'
  1. Data Management
  2. DM-10523

A change in period layout was left out from previous merge from RC

    Details

      Description

      Some changes in LC were pushed in RC but in the meantime dev version was changing and includes now a plotly library for charting.

      A version of LcPeriod.jsx has changed and need to be merged in the new version: LcPeriodPlotly.jsx

        Attachments

          Issue Links

            Activity

            Hide
            ejoliet Emmanuel Joliet added a comment -

            please, check that the change doesn't affect other plotly problem already detected in dev.
            This version includes the version defined for RC and will be the one use in LC tool for the June release at IRSA.

            Show
            ejoliet Emmanuel Joliet added a comment - please, check that the change doesn't affect other plotly problem already detected in dev. This version includes the version defined for RC and will be the one use in LC tool for the June release at IRSA.

              People

              • Assignee:
                ejoliet Emmanuel Joliet
                Reporter:
                ejoliet Emmanuel Joliet
                Reviewers:
                Cindy Wang [X] (Inactive), Tatiana Goldina
                Watchers:
                Cindy Wang [X] (Inactive), Emmanuel Joliet, Loi Ly, Tatiana Goldina, Xiuqin Wu [X] (Inactive)
              • Votes:
                0 Vote for this issue
                Watchers:
                5 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:

                  Summary Panel