Uploaded image for project: 'Data Management'
  1. Data Management
  2. DM-10875

Science Pipelines monthly narratives for August 2017

    XMLWordPrintable

    Details

    • Type: Story
    • Status: Done
    • Resolution: Done
    • Fix Version/s: None
    • Component/s: None
    • Labels:
      None
    • Story Points:
      2.5
    • Epic Link:
    • Sprint:
      DRP F17-4
    • Team:
      Data Release Production

      Description

      Need to include both AP (02C.03) and DRP (02C.04) in this activity.

        Attachments

          Activity

          No builds found.
          swinbank John Swinbank created issue -
          swinbank John Swinbank made changes -
          Field Original Value New Value
          Epic Link DM-10816 [ 32796 ]
          swinbank John Swinbank made changes -
          Summary DRP monthly narrative for August 2017 Science Pipelines monthly narratives for August 2017
          swinbank John Swinbank made changes -
          Story Points 1.5 2.5
          swinbank John Swinbank made changes -
          Description Need to include both AP (02C.03) and DRP (02C.04) in this activity.
          Hide
          swinbank John Swinbank added a comment -

          Done.

          Show
          swinbank John Swinbank added a comment - Done.
          swinbank John Swinbank made changes -
          Resolution Done [ 10000 ]
          Status To Do [ 10001 ] Done [ 10002 ]

            People

            Assignee:
            swinbank John Swinbank
            Reporter:
            swinbank John Swinbank
            Watchers:
            John Swinbank
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

              Dates

              Created:
              Updated:
              Resolved:

                CI Builds

                No builds found.