Uploaded image for project: 'Data Management'
  1. Data Management
  2. DM-10881

Per WBS breakout of Science Pipelines actuals for August 2017

    Details

    • Type: Story
    • Status: Done
    • Resolution: Done
    • Fix Version/s: None
    • Component/s: None
    • Labels:
      None
    • Templates:
    • Story Points:
      1
    • Epic Link:
    • Sprint:
      DRP F17-4
    • Team:
      Data Release Production

      Description

      Need to include both AP (02C.03) and DRP (02C.04) in this activity, although the reporting formats are likely different. (I understand 02C.03 goes through Nikolina Horvat, but the mechanism is hazy).

        Attachments

          Container Issues

            Activity

              People

              • Assignee:
                swinbank John Swinbank
                Reporter:
                swinbank John Swinbank
                Watchers:
                John Swinbank
              • Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:

                  Summary Panel