  2. DM-11024

migrate macpro/ESXI nodes to NOAO DC

    Details

      Description

      The switch, pdu, + kvm for the macpros need to be unboxed, checked for basic function, have firmware updates installed and have basic network configuration.

        Attachments

          Activity

          Hide
          jhoblitt Joshua Hoblitt added a comment -
          • A /24 subnet allocation has been obtained from NOAO CIS
          • A juniper switch, raritan kvm, and raritan managed PDU have had firmware updated, been configured, and installed in a rackmount cabinet shared with the CIS phone system
          • the macpros were physically migrated to the NOAO DC and the ESXI network configuraiton updated
          • CIS opened border firewall holes so that SQRE could manage its own ACLs
          • the production jenkins (ci.lsst.codes) osx buld agent configuration was updated
          Show
          jhoblitt Joshua Hoblitt added a comment - A /24 subnet allocation has been obtained from NOAO CIS A juniper switch, raritan kvm, and raritan managed PDU have had firmware updated, been configured, and installed in a rackmount cabinet shared with the CIS phone system the macpros were physically migrated to the NOAO DC and the ESXI network configuraiton updated CIS opened border firewall holes so that SQRE could manage its own ACLs the production jenkins (ci.lsst.codes) osx buld agent configuration was updated

            People

            • Assignee:
              jhoblitt Joshua Hoblitt
              Reporter:
              jhoblitt Joshua Hoblitt
              Watchers:
              Frossie Economou, Joshua Hoblitt
            • Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved:

                Summary Panel