Organize T/CAM input on F17 milestones

    Details

    • Type: Story
    • Status: Done
    • Resolution: Done
    • Fix Version/s: None
    • Component/s: None
    • Labels:
      None
    • Story Points:
      2
    • Epic Link:
    • Sprint:
      DRP F17-3
    • Team:
      Data Release Production

      Description

      Before we can switch to the replan schedule, we must ensure that all F17 milestones are complete or are mapped to post-replan milestones.

      Work with the T/CAMs to achieve this.

        Attachments

          Issue Links

            Activity

            Hide
            swinbank John Swinbank added a comment -
            Show
            swinbank John Swinbank added a comment - T/CAMs requested to provide input here: https://docs.google.com/spreadsheets/d/1C-vXWVxOEH9XoM7cJNuP1cG4YnKD4HyKZ5uaMucpzr0/edit#gid=1398110179 NLT 2017-08-11.
            Hide
            swinbank John Swinbank added a comment -

            Having collected status on all milestones, I need to consult with Kevin about whether we can make the old ones "vanish".

            Show
            swinbank John Swinbank added a comment - Having collected status on all milestones, I need to consult with Kevin about whether we can make the old ones "vanish".

              People

              • Assignee:
                swinbank John Swinbank
                Reporter:
                swinbank John Swinbank
                Watchers:
                John Swinbank
              • Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:
                  End date:

                  Summary Panel