Uploaded image for project: 'Data Management'
  1. Data Management
  2. DM-1231

LSE-69: Bring to Phase 3

    Details

    • Epic Name:
      SE - LSE-69: Phase 3 work (Summer 2015)
    • Story Points:
      0
    • WBS:
      02C.02.02
    • Team:
      Architecture
    • Cycle:
      Summer 2015

      Description

      Reflects work needed in Summer 2015

        Attachments

          Activity

          gpdf Gregory Dubois-Felsmann created issue -
          gpdf Gregory Dubois-Felsmann made changes -
          Field Original Value New Value
          Component/s Systems Engineering [ 10709 ]
          gpdf Gregory Dubois-Felsmann made changes -
          Labels ICD
          gpdf Gregory Dubois-Felsmann made changes -
          WBS 02C.02.02
          Assignee Gregory Dubois-Felsmann [ gpdf ]
          gpdf Gregory Dubois-Felsmann made changes -
          Description Reflects work needed in Summer 2015
          gpdf Gregory Dubois-Felsmann made changes -
          Cycle Summer 2015 [ 10202 ]
          gpdf Gregory Dubois-Felsmann made changes -
          Team Systems Engineering [ 10304 ]
          gpdf Gregory Dubois-Felsmann made changes -
          Rank Ranked lower
          klong Kevin Long made changes -
          Team Management and Architecture [ 10304 ] Process Middleware [ 10206 ]
          gpdf Gregory Dubois-Felsmann made changes -
          Team Process Middleware [ 10206 ] Management and Architecture [ 10304 ]
          frossie Frossie Economou made changes -
          Cycle Summer 2015 [ 10801 ]
          gpdf Gregory Dubois-Felsmann made changes -
          Story Points 0
          gpdf Gregory Dubois-Felsmann made changes -
          Epic Name SE - LSE-69: Bring to Phase 3 SE - LSE-69: Phase 3 work (Summer 2015)
          Hide
          gpdf Gregory Dubois-Felsmann added a comment -

          Story points had never been set for this epic, because it was unclear what work would be possible during this cycle.

          In the end no demands from either side for clarifications or further details emerged during Summer 2015.

          The main open area is the management of camera engineering data, where there are TBDs and TBCs, but this cannot be resolved until the Camera is able to make a concrete proposal for the "partitioning" of the image data buffer. That will emerge in LSE-68 work.

          Show
          gpdf Gregory Dubois-Felsmann added a comment - Story points had never been set for this epic, because it was unclear what work would be possible during this cycle. In the end no demands from either side for clarifications or further details emerged during Summer 2015. The main open area is the management of camera engineering data, where there are TBDs and TBCs, but this cannot be resolved until the Camera is able to make a concrete proposal for the "partitioning" of the image data buffer. That will emerge in LSE-68 work.
          Hide
          gpdf Gregory Dubois-Felsmann added a comment -

          Story points set to zero, marked done. Expecting substantive work in Winter 2016.

          Show
          gpdf Gregory Dubois-Felsmann added a comment - Story points set to zero, marked done. Expecting substantive work in Winter 2016.
          gpdf Gregory Dubois-Felsmann made changes -
          Resolution Done [ 10000 ]
          Status To Do [ 10001 ] Done [ 10002 ]
          gpdf Gregory Dubois-Felsmann made changes -
          Epic Status To Do [ 10101 ] Done [ 10103 ]

            People

            • Assignee:
              gpdf Gregory Dubois-Felsmann
              Reporter:
              gpdf Gregory Dubois-Felsmann
              Watchers:
              Gregory Dubois-Felsmann
            • Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved:

                Summary Panel