Uploaded image for project: 'Data Management'
  1. Data Management
  2. DM-1234

LSE-72: Remaining Phase 2 details

    XMLWordPrintable

    Details

    • Epic Name:
      SE - LSE-72: Remaining Phase 2 details
    • Story Points:
      10
    • WBS:
      02C.02.02
    • Team:
      Architecture
    • Cycle:
      Winter 2015

      Description

      Sort out remaining Phase 2 details of LSE-72, especially:

      • details of the configuration mechanism (yet to appear even in LSE-70), the publication of available configuration keys, the efficient publication of configuration contents, OCS-driven configuration "knobbing"
      • specific list of events to be published by DM
      • more specific EFD-query language
      • EFD deployment model (understanding of distributed design envisioned by OCS and its implications for the ICD)

        Attachments

          Issue Links

          Stories in Epic (Custom Issue Matrix)

            Activity

            No builds found.
            gpdf Gregory Dubois-Felsmann created issue -
            gpdf Gregory Dubois-Felsmann made changes -
            Field Original Value New Value
            Component/s Systems Engineering [ 10709 ]
            Story Points 10
            WBS 02C.02.02
            Assignee Gregory Dubois-Felsmann [ gpdf ]
            Description Sort out remaining Phase 2 details of LSE-72, especially:
            * details of the configuration mechanism (yet to appear even in LSE-70), the publication of available configuration keys, the efficient publication of configuration contents, OCS-driven configuration "knobbing"
            * specific list of events to be published by DM
            * more specific EFD-query language
            * EFD deployment model (understanding of distributed design envisioned by OCS and its implications for the ICD)
            Due Date 12/Dec/14
            Labels ICD LSE-70 LSE-72
            gpdf Gregory Dubois-Felsmann made changes -
            Cycle Winter 2015 [ 10201 ]
            jkantor Jeff Kantor made changes -
            Team Tucson [ 10302 ]
            jkantor Jeff Kantor made changes -
            Epic Name SE - W15 LSE-72: Remaining Phase 2 details SE - LSE-72: Remaining Phase 2 details
            gpdf Gregory Dubois-Felsmann made changes -
            Team Tucson [ 10302 ] Systems Engineering [ 10304 ]
            gpdf Gregory Dubois-Felsmann made changes -
            Rank Ranked higher
            gpdf Gregory Dubois-Felsmann made changes -
            Due Date 12/Dec/14 27/Feb/15
            Hide
            gpdf Gregory Dubois-Felsmann added a comment -

            Work on these issues is expected to begin with the publication by the OCS of a revised version of LSE-70 in January 2015, and at the OCS workshop 19-20 February 2015.

            Show
            gpdf Gregory Dubois-Felsmann added a comment - Work on these issues is expected to begin with the publication by the OCS of a revised version of LSE-70 in January 2015, and at the OCS workshop 19-20 February 2015.
            frossie Frossie Economou made changes -
            Cycle Winter 2015 [ 10800 ]
            gpdf Gregory Dubois-Felsmann made changes -
            Epic Child DM-3620 [ 19718 ]
            gpdf Gregory Dubois-Felsmann made changes -
            Epic Child DM-3621 [ 19719 ]
            gpdf Gregory Dubois-Felsmann made changes -
            Remote Link This issue links to "Wiki Page (Confluence)" [ 13055 ]
            gpdf Gregory Dubois-Felsmann made changes -
            Remote Link This issue links to "LSE-70 in Docushare (Web Link)" [ 13056 ]
            gpdf Gregory Dubois-Felsmann made changes -
            Status To Do [ 10001 ] In Progress [ 3 ]
            gpdf Gregory Dubois-Felsmann made changes -
            Remote Link This issue links to "LSE-72 in Docushare (Web Link)" [ 13057 ]
            Hide
            gpdf Gregory Dubois-Felsmann added a comment -

            The November 2014 and February 2015 workshops moved LSE-70 forward quite a bit, but there was still no official version by the end of this cycle, and so no update to LSE-72 was released. Work will continue in the next cycle.

            Show
            gpdf Gregory Dubois-Felsmann added a comment - The November 2014 and February 2015 workshops moved LSE-70 forward quite a bit, but there was still no official version by the end of this cycle, and so no update to LSE-72 was released. Work will continue in the next cycle.
            gpdf Gregory Dubois-Felsmann made changes -
            Resolution Done [ 10000 ]
            Status In Progress [ 3 ] Done [ 10002 ]
            gpdf Gregory Dubois-Felsmann made changes -
            Epic Status To Do [ 10101 ] Done [ 10103 ]

              People

              Assignee:
              gpdf Gregory Dubois-Felsmann
              Reporter:
              gpdf Gregory Dubois-Felsmann
              Watchers:
              Gregory Dubois-Felsmann
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Dates

                Due:
                Created:
                Updated:
                Resolved:

                  Jenkins

                  No builds found.