Details
-
Type:
Epic
-
Status: Done
-
Resolution: Done
-
Fix Version/s: None
-
Component/s: Systems Engineering
-
Epic Name:SE - LSE-75: Refine WCS and PSF requirements
-
Story Points:8
-
WBS:02C.02.02
-
Team:Architecture
-
Cycle:Summer 2015
Description
Clarify the data format and precision requirements of the TCS (or other Telescope and Site components) on the reporting of WCS and PSF information by DM on a per-image basis.
Depends on the ability of the T&S group to engage with this subject during the Winter 2015 period. Can be deferred to Summer 2015 without major impacts.
Current PMCS deadline for Phase 3 readiness of LSE-75 is 29-Sep-2015.
Attachments
Issue Links
- Wiki Page
-
Wiki Page Loading...
Key | Summary | Story Points | Assignee | Status | |
---|---|---|---|---|---|
|
3 | Gregory Dubois-Felsmann | Done | ||
|
2 | Gregory Dubois-Felsmann | Done | ||
|
Summarize current LSE-75 status as intro for new T&S personnel |
4 | Gregory Dubois-Felsmann | Done |
LIT-124 is a pre-existing SE issue that addresses part of the scope of
DM-1237