Uploaded image for project: 'Data Management'
  1. Data Management
  2. DM-1237

LSE-75: Refine WCS and PSF requirements

    Details

    • Templates:
    • Epic Name:
      SE - LSE-75: Refine WCS and PSF requirements
    • Story Points:
      8
    • WBS:
      02C.02.02
    • Team:
      Architecture
    • Cycle:
      Summer 2015

      Description

      Clarify the data format and precision requirements of the TCS (or other Telescope and Site components) on the reporting of WCS and PSF information by DM on a per-image basis.

      Depends on the ability of the T&S group to engage with this subject during the Winter 2015 period. Can be deferred to Summer 2015 without major impacts.

      Current PMCS deadline for Phase 3 readiness of LSE-75 is 29-Sep-2015.

        Attachments

          Container Issues

            Issue Links

              Activity

                People

                • Assignee:
                  gpdf Gregory Dubois-Felsmann
                  Reporter:
                  gpdf Gregory Dubois-Felsmann
                  Watchers:
                  Gregory Dubois-Felsmann, Sandrine Thomas
                • Votes:
                  0 Vote for this issue
                  Watchers:
                  2 Start watching this issue

                  Dates

                  • Due:
                    Created:
                    Updated:
                    Resolved:

                    Summary Panel