Uploaded image for project: 'Data Management'
  1. Data Management
  2. DM-1237

LSE-75: Refine WCS and PSF requirements

    XMLWordPrintable

    Details

    • Epic Name:
      SE - LSE-75: Refine WCS and PSF requirements
    • Story Points:
      8
    • WBS:
      02C.02.02
    • Team:
      Architecture
    • Cycle:
      Summer 2015

      Description

      Clarify the data format and precision requirements of the TCS (or other Telescope and Site components) on the reporting of WCS and PSF information by DM on a per-image basis.

      Depends on the ability of the T&S group to engage with this subject during the Winter 2015 period. Can be deferred to Summer 2015 without major impacts.

      Current PMCS deadline for Phase 3 readiness of LSE-75 is 29-Sep-2015.

        Attachments

          Issue Links

          Stories in Epic (Custom Issue Matrix)

            Activity

            Hide
            gpdf Gregory Dubois-Felsmann added a comment -

            LIT-124 is a pre-existing SE issue that addresses part of the scope of DM-1237

            Show
            gpdf Gregory Dubois-Felsmann added a comment - LIT-124 is a pre-existing SE issue that addresses part of the scope of DM-1237
            Hide
            gpdf Gregory Dubois-Felsmann added a comment -

            Moved this epic to Summer 2015 as the original description anticipated.

            This epic covers DM work in preparing for and having this discussion with the Telescope group. Other smaller pending LSE-75 issues may be included.

            Show
            gpdf Gregory Dubois-Felsmann added a comment - Moved this epic to Summer 2015 as the original description anticipated. This epic covers DM work in preparing for and having this discussion with the Telescope group. Other smaller pending LSE-75 issues may be included.
            Hide
            gpdf Gregory Dubois-Felsmann added a comment -

            One back-and forth round completed after the initial change memo.

            Show
            gpdf Gregory Dubois-Felsmann added a comment - One back-and forth round completed after the initial change memo.

              People

              Assignee:
              gpdf Gregory Dubois-Felsmann
              Reporter:
              gpdf Gregory Dubois-Felsmann
              Watchers:
              Gregory Dubois-Felsmann, Sandrine Thomas
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Dates

                Due:
                Created:
                Updated:
                Resolved:

                  Jenkins

                  No builds found.