Uploaded image for project: 'Data Management'
  1. Data Management
  2. DM-1237

LSE-75: Refine WCS and PSF requirements

    XMLWordPrintable

    Details

    • Epic Name:
      SE - LSE-75: Refine WCS and PSF requirements
    • Story Points:
      8
    • WBS:
      02C.02.02
    • Team:
      Architecture
    • Cycle:
      Summer 2015

      Description

      Clarify the data format and precision requirements of the TCS (or other Telescope and Site components) on the reporting of WCS and PSF information by DM on a per-image basis.

      Depends on the ability of the T&S group to engage with this subject during the Winter 2015 period. Can be deferred to Summer 2015 without major impacts.

      Current PMCS deadline for Phase 3 readiness of LSE-75 is 29-Sep-2015.

        Attachments

          Issue Links

          Stories in Epic (Custom Issue Matrix)

            Activity

            No builds found.
            gpdf Gregory Dubois-Felsmann created issue -
            gpdf Gregory Dubois-Felsmann made changes -
            Field Original Value New Value
            Component/s Systems Engineering [ 10709 ]
            gpdf Gregory Dubois-Felsmann made changes -
            Labels ICD LSE-75
            gpdf Gregory Dubois-Felsmann made changes -
            Assignee Gregory Dubois-Felsmann [ gpdf ]
            gpdf Gregory Dubois-Felsmann made changes -
            Story Points 8
            Description Clarify the data format and precision requirements of the TCS (or other Telescope and Site components) on the reporting of WCS and PSF information by DM on a per-image basis.

            Depends on the ability of the T&S group to engage with this subject during the Winter 2015 period. Can be deferred to Summer 2015 without major impacts.

            Current PMCS deadline for Phase 3 readiness of LSE-75 is 29-Sep-2015.
            Due Date 27/Feb/15
            gpdf Gregory Dubois-Felsmann made changes -
            WBS 02C.02.02
            gpdf Gregory Dubois-Felsmann made changes -
            Cycle Winter 2015 [ 10201 ]
            jkantor Jeff Kantor made changes -
            Team Tucson [ 10302 ]
            jkantor Jeff Kantor made changes -
            Epic Name SE - W15 LSE-75: Refine WCS and PSF requirements SE - LSE-75: Refine WCS and PSF requirements
            gpdf Gregory Dubois-Felsmann made changes -
            Team Tucson [ 10302 ] Systems Engineering [ 10304 ]
            Hide
            gpdf Gregory Dubois-Felsmann added a comment -

            LIT-124 is a pre-existing SE issue that addresses part of the scope of DM-1237

            Show
            gpdf Gregory Dubois-Felsmann added a comment - LIT-124 is a pre-existing SE issue that addresses part of the scope of DM-1237
            gpdf Gregory Dubois-Felsmann made changes -
            Link This issue has to be finished together with LIT-124 [ LIT-124 ]
            gpdf Gregory Dubois-Felsmann made changes -
            Rank Ranked higher
            frossie Frossie Economou made changes -
            Cycle Winter 2015 [ 10800 ]
            gpdf Gregory Dubois-Felsmann made changes -
            Cycle Winter 2015 [ 10800 ] Summer 2015 [ 10801 ]
            Hide
            gpdf Gregory Dubois-Felsmann added a comment -

            Moved this epic to Summer 2015 as the original description anticipated.

            This epic covers DM work in preparing for and having this discussion with the Telescope group. Other smaller pending LSE-75 issues may be included.

            Show
            gpdf Gregory Dubois-Felsmann added a comment - Moved this epic to Summer 2015 as the original description anticipated. This epic covers DM work in preparing for and having this discussion with the Telescope group. Other smaller pending LSE-75 issues may be included.
            gpdf Gregory Dubois-Felsmann made changes -
            Due Date 27/Feb/15 31/Aug/15
            gpdf Gregory Dubois-Felsmann made changes -
            Epic Child DM-3654 [ 19757 ]
            gpdf Gregory Dubois-Felsmann made changes -
            Status To Do [ 10001 ] In Progress [ 3 ]
            gpdf Gregory Dubois-Felsmann made changes -
            Epic Child DM-3657 [ 19766 ]
            gpdf Gregory Dubois-Felsmann made changes -
            Remote Link This issue links to "Wiki Page (Confluence)" [ 13069 ]
            gpdf Gregory Dubois-Felsmann made changes -
            Epic Child DM-3658 [ 19767 ]
            Hide
            gpdf Gregory Dubois-Felsmann added a comment -

            One back-and forth round completed after the initial change memo.

            Show
            gpdf Gregory Dubois-Felsmann added a comment - One back-and forth round completed after the initial change memo.
            gpdf Gregory Dubois-Felsmann made changes -
            Resolution Done [ 10000 ]
            Status In Progress [ 3 ] Done [ 10002 ]
            gpdf Gregory Dubois-Felsmann made changes -
            Epic Status To Do [ 10101 ] Done [ 10103 ]
            jkantor Jeff Kantor made changes -
            Link This issue is cloned by DM-3841 [ DM-3841 ]
            jkantor Jeff Kantor made changes -
            Link This issue is cloned by DM-3841 [ DM-3841 ]

              People

              Assignee:
              gpdf Gregory Dubois-Felsmann
              Reporter:
              gpdf Gregory Dubois-Felsmann
              Watchers:
              Gregory Dubois-Felsmann, Sandrine Thomas
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Dates

                Due:
                Created:
                Updated:
                Resolved:

                  CI Builds

                  No builds found.