Uploaded image for project: 'Data Management'
  1. Data Management
  2. DM-1237

LSE-75: Refine WCS and PSF requirements

    XMLWordPrintable

    Details

    • Epic Name:
      SE - LSE-75: Refine WCS and PSF requirements
    • Story Points:
      8
    • WBS:
      02C.02.02
    • Team:
      Architecture
    • Cycle:
      Summer 2015

      Description

      Clarify the data format and precision requirements of the TCS (or other Telescope and Site components) on the reporting of WCS and PSF information by DM on a per-image basis.

      Depends on the ability of the T&S group to engage with this subject during the Winter 2015 period. Can be deferred to Summer 2015 without major impacts.

      Current PMCS deadline for Phase 3 readiness of LSE-75 is 29-Sep-2015.

        Attachments

          Issue Links

          Stories in Epic (Custom Issue Matrix)

            Activity

              People

              Assignee:
              gpdf Gregory Dubois-Felsmann
              Reporter:
              gpdf Gregory Dubois-Felsmann
              Watchers:
              Gregory Dubois-Felsmann, Sandrine Thomas
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Dates

                Due:
                Created:
                Updated:
                Resolved:

                  CI Builds

                  No builds found.