Details
-
Type:
Epic
-
Status: Done
-
Resolution: Done
-
Fix Version/s: None
-
Component/s: Systems Engineering
-
Epic Name:SE - LSE-140: Bring Summer 2014 work to CCB approval
-
Story Points:6
-
WBS:02C.02.02
-
Team:Architecture
-
Cycle:Winter 2015
Description
Convert the existing LSE-140 draft to SysML, produce a docgen, and review with Jacques Sebag. Bring to CCB meeting on 8 October under existing LCR-201.
Attachments
Issue Links
- has to be done after
-
DM-310 ICD LSE-140 between DM and T&S for auxiliary (calibration) instrumentation
- Done
Key | Summary | Story Points | Assignee | Status | |
---|---|---|---|---|---|
|
2 | Gregory Dubois-Felsmann | Done | ||
|
2 | Gregory Dubois-Felsmann | Done | ||
|
2 | Gregory Dubois-Felsmann | Done |
DM-310was the Summer 2014 work on this task.