Uploaded image for project: 'Data Management'
  1. Data Management
  2. DM-1242

Risk Register refresh 1/2015

    XMLWordPrintable

    Details

    • Epic Name:
      Risk Register refresh 1/2015
    • Story Points:
      3
    • WBS:
      02C.02.02
    • Team:
      Architecture
    • Cycle:
      Winter 2015

      Description

      Periodic review of DM risk register contents. Covers preparation for a review expected at the end of January 2015, the only one during Winter 2015.

        Attachments

        Stories in Epic (Custom Issue Matrix)

        Key Summary Story Points Assignee Status
         
        DM-3617

        Review risk register status

        3 Gregory Dubois-Felsmann Done

          Activity

          Hide
          gpdf Gregory Dubois-Felsmann added a comment -

          I've cut back the story points from 6 to 3 after it became clear that there would only be time for one such review during Winter 2015. There will probably be about three per year on average.

          Show
          gpdf Gregory Dubois-Felsmann added a comment - I've cut back the story points from 6 to 3 after it became clear that there would only be time for one such review during Winter 2015. There will probably be about three per year on average.

            People

            Assignee:
            gpdf Gregory Dubois-Felsmann
            Reporter:
            gpdf Gregory Dubois-Felsmann
            Watchers:
            Gregory Dubois-Felsmann, Kian-Tat Lim
            Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

              Dates

              Due:
              Created:
              Updated:
              Resolved:

                Jenkins

                No builds found.