Create initial design for how DCR will fit in the stack

    Details

    • Story Points:
      8
    • Sprint:
      Alert Production F17 - 11, AP S18-1, AP S18-2, AP S18-3, AP S18-4, AP S18-5
    • Team:
      Alert Production

      Description

      Now that the prototype DCR code is finished it needs to be refactored and brought in to the stack. Since there is a substantial amount of code involved I will write an initial design first. The result of this ticket will be a brief report describing the code that will be added to existing packages and any anticipated changes.

        Attachments

          Issue Links

            Activity

            Hide
            sullivan Ian Sullivan added a comment - - edited

            A significant portion of the design is contained in the presentation for the UW DM brownbag: Brownbag discussion.pdf

            Show
            sullivan Ian Sullivan added a comment - - edited A significant portion of the design is contained in the presentation for the UW DM brownbag: Brownbag discussion.pdf
            Hide
            swinbank John Swinbank added a comment -

            Initial design complete; implementation is on DM-9615.

            Show
            swinbank John Swinbank added a comment - Initial design complete; implementation is on DM-9615 .

              People

              • Assignee:
                sullivan Ian Sullivan
                Reporter:
                sullivan Ian Sullivan
                Watchers:
                Ian Sullivan, John Swinbank
              • Votes:
                0 Vote for this issue
                Watchers:
                2 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:

                  Summary Panel