Uploaded image for project: 'Data Management'
  1. Data Management
  2. DM-12467

Prototype DCR code maintenance

    Details

    • Story Points:
      2
    • Sprint:
      Alert Production F17 - 11, AP S18-1
    • Team:
      Alert Production

      Description

      While working on the design of how the DCR algorithm will fit in the stack, the existing prototype code is expected to change to reflect new functionality and limitations.

        Attachments

          Issue Links

            Activity

            Hide
            sullivan Ian Sullivan added a comment -

            The hour angle is now calculated in StarFast and added to the FITS headers, which can be read in using `obs_lsstSim` with the changes from DM-13096. I re-ran all of the simulated data used for DCR testing.

            Show
            sullivan Ian Sullivan added a comment - The hour angle is now calculated in StarFast and added to the FITS headers, which can be read in using `obs_lsstSim` with the changes from DM-13096 . I re-ran all of the simulated data used for DCR testing.

              People

              • Assignee:
                sullivan Ian Sullivan
                Reporter:
                sullivan Ian Sullivan
                Watchers:
                Ian Sullivan
              • Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved: