Uploaded image for project: 'Data Management'
  1. Data Management
  2. DM-12585

clarify the applicability of real/bogus to nightly CoAdds in special programs

    Details

      Description

      The purpose of this ticket is to resolve whether or not the internal real/bogus routine be able to run on a nightly CoAdd of deep drilling difference images. If there will be issues due to a mismatch between the training and testing sets, what is the cost/benefit of fixing this and enabling this capability? This is not urgent and not limited to Special Programs.

      The nominal deadline has been set to 1.5 months prior to the expected call for Special Programs white paper proposals, but need not be resolved by then. Additional context for this ticket can be found in Section 6.2 of the DMTN study on DM and Special Programs, available at https://dmtn-065.lsst.io/

        Attachments

          Issue Links

            Activity

            mgraham Melissa Graham created issue -
            swinbank John Swinbank made changes -
            Field Original Value New Value
            Team DM Science [ 12218 ]
            mgraham Melissa Graham made changes -
            Description The purpose of this ticket is to resolve whether or not the internal real/bogus routine be able to run on a nightly CoAdd of deep drilling difference images. If there will be issues due to a mismatch between the training and testing sets, what is the cost/benefit of fixing this and enabling this capability? This is not urgent and not limited to Special Programs.

            The nominal deadline has been set to 1.5 months prior to the expected call for Special Programs white paper proposals, but need not be resolved by then. Additional context for this ticket can be found in Section 6.2 of the DMTN study on DM and Special Programs, available at https://github.com/lsst-dmsst/DM_SP_study/blob/master/ms.pdf
            The purpose of this ticket is to resolve whether or not the internal real/bogus routine be able to run on a nightly CoAdd of deep drilling difference images. If there will be issues due to a mismatch between the training and testing sets, what is the cost/benefit of fixing this and enabling this capability? This is not urgent and not limited to Special Programs.

            The nominal deadline has been set to 1.5 months prior to the expected call for Special Programs white paper proposals, but need not be resolved by then. Additional context for this ticket can be found in Section 6.2 of the DMTN study on DM and Special Programs, available at https://dmtn-065.lsst.io/
            mgraham Melissa Graham made changes -
            Assignee Mario Juric [ mjuric ] Leanne Guy [ lguy ]
            mgraham Melissa Graham made changes -
            Due Date 15/Feb/18 31/Dec/18
            mgraham Melissa Graham made changes -
            Link This issue is child task of DM-12575 [ DM-12575 ]
            gpdf Gregory Dubois-Felsmann made changes -
            Labels dm-sst SpecialPrograms dm-sst
            lguy Leanne Guy made changes -
            Epic Link DM-20374 [ 338242 ]
            mgraham Melissa Graham made changes -
            Due Date 31/Dec/18 01/Jun/20

              People

              • Assignee:
                lguy Leanne Guy
                Reporter:
                mgraham Melissa Graham
                Watchers:
                Eric Bellm, John Swinbank, Melissa Graham
              • Votes:
                0 Vote for this issue
                Watchers:
                3 Start watching this issue

                Dates

                • Due:
                  Created:
                  Updated:

                  Summary Panel