Uploaded image for project: 'Data Management'
  1. Data Management
  2. DM-12872

Generate useful plots of Jointcal results (II)

    Details

    • Type: Epic
    • Status: To Do
    • Resolution: Unresolved
    • Fix Version/s: None
    • Component/s: None
    • Labels:
      None
    • Epic Name:
      xNN-ap-jointcal-plots
    • WBS:
      02C.03.07
    • Team:
      Alert Production

      Description

      Continuation of the work started on DM-7058.

      Note that this epic is a "holding area" for tickets: move them into a scheduled epic (one which has the "cycle" field set) before working on them.

        Attachments

          Issue Links

          Stories in Epic (Custom Issue Matrix)

            Activity

            swinbank John Swinbank created issue -
            swinbank John Swinbank made changes -
            Field Original Value New Value
            Link This issue relates to DM-7058 [ DM-7058 ]
            swinbank John Swinbank made changes -
            Epic Child DM-7059 [ 26072 ]
            swinbank John Swinbank made changes -
            Epic Child DM-7060 [ 26073 ]
            swinbank John Swinbank made changes -
            Epic Child DM-7061 [ 26074 ]
            swinbank John Swinbank made changes -
            WBS 02C.03.08 02C.03.07
            swinbank John Swinbank made changes -
            Rank Ranked lower
            Parejkoj John Parejko made changes -
            Link This issue relates to DM-17829 [ DM-17829 ]

              People

              • Assignee:
                Parejkoj John Parejko
                Reporter:
                swinbank John Swinbank
                Watchers:
                John Swinbank
              • Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Dates

                • Created:
                  Updated:

                  Summary Panel