Uploaded image for project: 'Data Management'
  1. Data Management
  2. DM-1313

Identify Conditions information in LSE-130 that is required for Alert Production

    Details

      Description

      LSE-69 declares that there are two categories of Conditions data (telemetry) required by DM from the Camera: those items that are needed for Alert Production (for which the AP components at the Base will need a whitelist, and for which the Camera has a tighter latency requirement), and those that are not (but are then presumably needed in DRP or other deferred productions). It states that the subset needed for AP should be enumerated in LSE-130.

      The action here is to create an initial version of that list.

        Attachments

          Container Issues

            Activity

              People

              • Assignee:
                gpdf Gregory Dubois-Felsmann
                Reporter:
                gpdf Gregory Dubois-Felsmann
                Watchers:
                Gregory Dubois-Felsmann, Kian-Tat Lim, Mario Juric, Robert Lupton
              • Votes:
                0 Vote for this issue
                Watchers:
                4 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:

                  Summary Panel