Uploaded image for project: 'Data Management'
  1. Data Management
  2. DM-13359

Design and coding for Gen3 Butler

    Details

    • Type: Epic
    • Status: Done
    • Resolution: Done
    • Fix Version/s: None
    • Component/s: Middleware
    • Labels:
      None
    • Epic Name:
      S18 Arch Middleware
    • Story Points:
      80
    • WBS:
      02C.02.02.01
    • Team:
      Architecture
    • Cycle:
      Spring 2018

      Description

      Collaborate with Jim Bosch and Pim Schellart [X] on completing the use cases, requirements, and preliminary design of the Gen3 Butler.  Write Butler code for up to 50% of 4 months.

        Attachments

          Issue Links

            Activity

            Hide
            tjenness Tim Jenness added a comment -

            Kian-Tat Lim I think this Epic should be marked completed since it was covering butler work in last cycle.

            Show
            tjenness Tim Jenness added a comment - Kian-Tat Lim I think this Epic should be marked completed since it was covering butler work in last cycle.
            Hide
            ktl Kian-Tat Lim added a comment -

            Use cases, requirements, preliminary design, and initial coding were performed.

            Show
            ktl Kian-Tat Lim added a comment - Use cases, requirements, preliminary design, and initial coding were performed.

              People

              • Assignee:
                tjenness Tim Jenness
                Reporter:
                ktl Kian-Tat Lim
                Watchers:
                Kian-Tat Lim, Tim Jenness
              • Votes:
                0 Vote for this issue
                Watchers:
                2 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:

                  Summary Panel