Uploaded image for project: 'Data Management'
  1. Data Management
  2. DM-13665

Finalize the stack version, step, and config for the S18 PDR1 reprocessing

    Details

    • Type: Story
    • Status: Done
    • Resolution: Done
    • Fix Version/s: None
    • Component/s: None
    • Labels:
      None

      Description

      Decide and document the stack version, task steps, and configs to be used in the S18 reprocessing of the HSC PDR1 data on the Verification Cluster (DM-13666).

        Attachments

          Container Issues

            Issue Links

              Activity

                People

                • Assignee:
                  hchiang2 Hsin-Fang Chiang
                  Reporter:
                  hchiang2 Hsin-Fang Chiang
                  Reviewers:
                  Jim Bosch
                  Watchers:
                  Hsin-Fang Chiang, Jim Bosch, John Swinbank, Paul Price, Yusra AlSayyad
                • Votes:
                  0 Vote for this issue
                  Watchers:
                  5 Start watching this issue

                  Dates

                  • Created:
                    Updated:
                    Resolved:

                    Summary Panel