Uploaded image for project: 'Data Management'
  1. Data Management
  2. DM-14431

Alert Production pipeline infrastructure during F18

    Details

    • Type: Epic
    • Status: Done
    • Resolution: Done
    • Fix Version/s: None
    • Component/s: ap_pipe, ap_verify
    • Labels:
      None
    • Templates:
    • Epic Name:
      f18-ap-pipe
    • Story Points:
      125
    • WBS:
      02C.03.04
    • Team:
      Alert Production
    • Cycle:
      Fall 2018

      Description

      Work to support at scale processing with the Alert Production Pipeline, and improved collection of verification metrics. To include:

      • Ensure that ap_verify & ap_pipe is in lsst_distrib;
      • Packaging of test datasets;
      • Migration towards Butler G3 and SuperTask;
      • Ensure all AP code is tested in CI;
      • Develop infrastructure for instrumenting pipeline tasks for metric collection;
      • Implement more metrics as required.

        Attachments

          Activity

            People

            • Assignee:
              swinbank John Swinbank
              Reporter:
              swinbank John Swinbank
              Watchers:
              John Swinbank, Krzysztof Findeisen
            • Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved:

                Summary Panel