Uploaded image for project: 'Data Management'
  1. Data Management
  2. DM-16742

Jointcal development in S19

    Details

    • Type: Epic
    • Status: Done
    • Resolution: Done
    • Fix Version/s: None
    • Component/s: None
    • Labels:
      None
    • Templates:
    • Epic Name:
      s19a-ap-jointcal
    • Story Points:
      40
    • WBS:
      02C.03.07
    • Team:
      Alert Production
    • Cycle:
      Spring 2019

      Description

      The aims of this epic are to support Jointcal development through to the level that it is used by default in HSC data release processing; meas_mosaic can then be retired at leisure.

        Attachments

          Activity

            People

            • Assignee:
              swinbank John Swinbank
              Reporter:
              swinbank John Swinbank
              Watchers:
              John Swinbank
            • Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved:

                Summary Panel