Details
Description
M2 Functionality Check with CSC Controller @ the Summit:
- SAL functionality IS NOT a concern for this testing.
This Epic will correspond to the following P6 Activity:
- T&SC-14040401-1150 (Power the M2 controller. Check functionality)
Attachments
Issue Links
- has to be done before
-
DM-18321 M2 Functionality Check with CSC Controller + SAL - pt. 1
- Invalid
review