Uploaded image for project: 'Data Management'
  1. Data Management
  2. DM-17936

Presentation during DESC meeting (2/27/19) about what DM is doing in terms of ISR and CPP

    XMLWordPrintable

    Details

    • Type: Story
    • Status: Done
    • Resolution: Done
    • Fix Version/s: None
    • Component/s: None
    • Labels:
      None

      Description

      Representatives (M. Fisher-Levine, A. Plazas, A. Nomerotski, P. Antilogus, P. Astier) from DM and SAWG (DESC) had a telecon to discuss the topics to address during the joint DM-SAWG session at the next DESC winter meeting at Berkeley (2/27/19). The first topic will be a presentation from DM (by A. Plazas) on the state of the ISR, CPP pipelines (e.g., order of current ISR corrections, plan for generating calibration inputs, precision of current corrections, tests, etc). 

      This ticket will track the work on that, gathering input from DM people such as R. Lupton, C. Waters, and M. Fisher-Levine. 

        Attachments

          Activity

          Hide
          plazas Andrés Alejandro Plazas Malagón added a comment -

          From Chris Waters: 

          • The ticket on ISR ordering is DM-16802
          • Tickets about tests: 
            • Unit tests: DM-15683
            • Migrate, deprecate, and update code as needed to produce consistent ISR mock data: DM-1448
          Show
          plazas Andrés Alejandro Plazas Malagón added a comment - From Chris Waters:  The ticket on ISR ordering is  DM-16802 Tickets about tests:  Unit tests:  DM-15683 Migrate, deprecate, and update code as needed to produce consistent ISR mock data:  DM-1448
          Hide
          plazas Andrés Alejandro Plazas Malagón added a comment -

          From Robert Lupton: attached "isr.pdf" document on ISR order

          Show
          plazas Andrés Alejandro Plazas Malagón added a comment - From Robert Lupton: attached "isr.pdf" document on ISR order
          Hide
          plazas Andrés Alejandro Plazas Malagón added a comment -

           In preparation, I've been gathering information with the help of Chris Waters, Robert, and Merlin. See items under "Calibration Products Products" and "Instrument Signature Removal" (both in bold) at the top of the following page: https://confluence.lsstcorp.org/display/DM/Sensor+Characterization+and+ISR, for the current ISR ordering and calibration products. In particular, Robert's slides on the motivation for ISR order ("isr.pdf").

          Show
          plazas Andrés Alejandro Plazas Malagón added a comment -  In preparation, I've been gathering information with the help of Chris Waters, Robert, and Merlin. See items under "Calibration Products Products" and "Instrument Signature Removal" (both in bold) at the top of the following page:  https://confluence.lsstcorp.org/display/DM/Sensor+Characterization+and+ISR , for the current ISR ordering and calibration products. In particular, Robert's slides on the motivation for ISR order ("isr.pdf").
          Show
          plazas Andrés Alejandro Plazas Malagón added a comment - Presentation:  https://docs.google.com/presentation/d/1b1Z2IGcXTWR2R0QE2j8dJ07_CzEpkTiVex4JQj7CDDc/edit#slide=id.g2ade3bc380_0_0

            People

            Assignee:
            plazas Andrés Alejandro Plazas Malagón
            Reporter:
            plazas Andrés Alejandro Plazas Malagón
            Watchers:
            Andrés Alejandro Plazas Malagón, Merlin Fisher-Levine
            Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

              Dates

              Due:
              Created:
              Updated:
              Resolved:
              Start date:
              End date:

                Jenkins

                No builds found.