Auxtel Calibration System Integration Tests in Tucson

    XMLWordPrintable

    Details

    • Epic Name:
      Auxtel Calibration System Integration Tests in Tucson
    • Story Points:
      30
    • WBS:
      1.04C.15.3 (AuxTel)
    • Team:
      Telescope and Site

      Description

      Location:

      • Tucson

      Purpose:

      • Auxtel Calibration System Integration Tests

      Required Components:

      • ATMonochromator
      • FiberSpectrograph
      • Electrometer
      • ATSpectrograph
      • ATCamera

      Resources Required:

      • Integration & Test Environment
      • SAL
      • EFD
      • Calibration Scripts

        Attachments

          Issue Links

            Activity

            Hide
            aclements Andy Clements added a comment -

            Adding start/end dates from P6.  Note: may not match reality.

            Show
            aclements Andy Clements added a comment - Adding start/end dates from P6.  Note: may not match reality.
            Hide
            aclements Andy Clements added a comment -

            Emailed Patrick, the low down on this one is:

            much of the work was completed. However, now the fiber spectrograph is being redone and the electrometer has undergone changes as well. If you want you could close that epic so long as there is an epic to retest those components once they all come back up. I suggest doing this in the same place as wherever the white light source would get integrated, as it’s in the same bunch (we just excluded it because it was never going to get done in time.

            Due to the fact that there is still 23 SP points left on this, we will continue using it.

             

            Show
            aclements Andy Clements added a comment - Emailed Patrick, the low down on this one is: much of the work was completed. However, now the fiber spectrograph is being redone and the electrometer has undergone changes as well. If you want you could close that epic so long as there is an epic to retest those components once they all come back up. I suggest doing this in the same place as wherever the white light source would get integrated, as it’s in the same bunch (we just excluded it because it was never going to get done in time. Due to the fact that there is still 23 SP points left on this, we will continue using it.  
            Hide
            aclements Andy Clements added a comment -

            I believe all the Auxiliary Telescope System Integration Work in Tucson is complete.  Please review.  Thanks.

            Show
            aclements Andy Clements added a comment - I believe all the Auxiliary Telescope System Integration Work in Tucson is complete.  Please review.  Thanks.
            Hide
            pingraham Patrick Ingraham added a comment -

            Calibration components functional. Will do final check after mechanical/electrical assembly is completed.

            Show
            pingraham Patrick Ingraham added a comment - Calibration components functional. Will do final check after mechanical/electrical assembly is completed.

              People

              Assignee:
              tribeiro Tiago Ribeiro
              Reporter:
              jbuffill James Buffill [X] (Inactive)
              Reviewers:
              Patrick Ingraham
              Watchers:
              Andy Clements, James Buffill [X] (Inactive), Patrick Ingraham, Tiago Ribeiro
              Votes:
              0 Vote for this issue
              Watchers:
              4 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:
                Start date:
                End date:

                  Jenkins

                  No builds found.