Uploaded image for project: 'Data Management'
  1. Data Management
  2. DM-18411

Auxtel Calibration System Integration Tests in Tucson

    XMLWordPrintable

    Details

    • Epic Name:
      Auxtel Calibration System Integration Tests in Tucson
    • Story Points:
      30
    • WBS:
      1.04C.15.3 (AuxTel)
    • Team:
      Telescope and Site

      Description

      Location:

      • Tucson

      Purpose:

      • Auxtel Calibration System Integration Tests

      Required Components:

      • ATMonochromator
      • FiberSpectrograph
      • Electrometer
      • ATSpectrograph
      • ATCamera

      Resources Required:

      • Integration & Test Environment
      • SAL
      • EFD
      • Calibration Scripts

        Attachments

          Issue Links

            Activity

            No builds found.
            jbuffill James Buffill [X] (Inactive) created issue -
            jbuffill James Buffill [X] (Inactive) made changes -
            Field Original Value New Value
            Link This issue has to be done before DM-18412 [ DM-18412 ]
            jbuffill James Buffill [X] (Inactive) made changes -
            Description Auxtel Calibration System Integration Tests in Tucson Location:
             * Tucson

            Purpose:
             * Auxtel Calibration System Integration Tests

            Required Components:
             - ATMonochromator
             - FiberSpectrograph
             - Electrometer
             - ATSpectrograph
             - ATCamera

            Resources Required:
             * Integration & Test Environment
             * SAL
             * EFD
             * Calibration Scripts
            jbuffill James Buffill [X] (Inactive) made changes -
            Link This issue is cloned by DM-18449 [ DM-18449 ]
            jbuffill James Buffill [X] (Inactive) made changes -
            Reviewers Patrick Ingraham [ pingraham ]
            jbuffill James Buffill [X] (Inactive) made changes -
            Link This issue is cloned by DM-18449 [ DM-18449 ]
            jbuffill James Buffill [X] (Inactive) made changes -
            Epic Child DM-18173 [ 241124 ]
            jbuffill James Buffill [X] (Inactive) made changes -
            Status To Do [ 10001 ] In Progress [ 3 ]
            ecoughlin Eric Coughlin made changes -
            Epic Child DM-18595 [ 244906 ]
            jbuffill James Buffill [X] (Inactive) made changes -
            Labels AuxTel-IndomeCalib auxtel AuxTel-IndomeCalib Integration auxtel
            aclements Andy Clements made changes -
            Story Points 30
            jbuffill James Buffill [X] (Inactive) made changes -
            Epic Child DM-19417 [ 262433 ]
            jbuffill James Buffill [X] (Inactive) made changes -
            Epic Child DM-20260 [ 330758 ]
            Hide
            aclements Andy Clements added a comment -

            Adding start/end dates from P6.  Note: may not match reality.

            Show
            aclements Andy Clements added a comment - Adding start/end dates from P6.  Note: may not match reality.
            aclements Andy Clements made changes -
            End date 19/Jun/19
            Start date 28/May/19
            Hide
            aclements Andy Clements added a comment -

            Emailed Patrick, the low down on this one is:

            much of the work was completed. However, now the fiber spectrograph is being redone and the electrometer has undergone changes as well. If you want you could close that epic so long as there is an epic to retest those components once they all come back up. I suggest doing this in the same place as wherever the white light source would get integrated, as it’s in the same bunch (we just excluded it because it was never going to get done in time.

            Due to the fact that there is still 23 SP points left on this, we will continue using it.

             

            Show
            aclements Andy Clements added a comment - Emailed Patrick, the low down on this one is: much of the work was completed. However, now the fiber spectrograph is being redone and the electrometer has undergone changes as well. If you want you could close that epic so long as there is an epic to retest those components once they all come back up. I suggest doing this in the same place as wherever the white light source would get integrated, as it’s in the same bunch (we just excluded it because it was never going to get done in time. Due to the fact that there is still 23 SP points left on this, we will continue using it.  
            aclements Andy Clements made changes -
            Epic Child DM-22406 [ 427090 ]
            aclements Andy Clements made changes -
            Epic Child DM-23324 [ 429814 ]
            aclements Andy Clements made changes -
            Epic Child DM-23325 [ 429815 ]
            aclements Andy Clements made changes -
            Epic Child DM-22700 [ 427910 ]
            aclements Andy Clements made changes -
            Epic Child DM-23560 [ 430583 ]
            rowen Russell Owen made changes -
            Epic Child DM-24047 [ 432559 ]
            aclements Andy Clements made changes -
            Epic Child DM-24227 [ 432762 ]
            aclements Andy Clements made changes -
            Epic Child DM-24248 [ 432805 ]
            aclements Andy Clements made changes -
            Epic Child DM-23773 [ 431518 ]
            aclements Andy Clements made changes -
            Epic Child DM-24447 [ 433275 ]
            aclements Andy Clements made changes -
            Epic Child DM-24507 [ 433492 ]
            Hide
            aclements Andy Clements added a comment -

            I believe all the Auxiliary Telescope System Integration Work in Tucson is complete.  Please review.  Thanks.

            Show
            aclements Andy Clements added a comment - I believe all the Auxiliary Telescope System Integration Work in Tucson is complete.  Please review.  Thanks.
            aclements Andy Clements made changes -
            Status In Progress [ 3 ] In Review [ 10004 ]
            Hide
            pingraham Patrick Ingraham added a comment -

            Calibration components functional. Will do final check after mechanical/electrical assembly is completed.

            Show
            pingraham Patrick Ingraham added a comment - Calibration components functional. Will do final check after mechanical/electrical assembly is completed.
            pingraham Patrick Ingraham made changes -
            Status In Review [ 10004 ] Reviewed [ 10101 ]
            aclements Andy Clements made changes -
            Resolution Done [ 10000 ]
            Status Reviewed [ 10101 ] Done [ 10002 ]

              People

              Assignee:
              tribeiro Tiago Ribeiro
              Reporter:
              jbuffill James Buffill [X] (Inactive)
              Reviewers:
              Patrick Ingraham
              Watchers:
              Andy Clements, James Buffill [X] (Inactive), Patrick Ingraham, Tiago Ribeiro
              Votes:
              0 Vote for this issue
              Watchers:
              4 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:
                Start date:
                End date:

                  Jenkins