    Description

      Produce a single jumping-off point for documentation on all aspects of Level 3, on Confluence. Ensure that flowdown for existing Level 3 requirements in SysML is modeled. Describe the high-level conceptual design.

      Attachments

        Issue Links

          Activity

            We no longer use HipChat

            womullan Wil O'Mullane added a comment - We no longer use HipChat
            gpdf Gregory Dubois-Felsmann added a comment - - edited

            All "Level 3 -ish" requirements are collected on the linked Confluence page "Level 3 Definition and Traceability".  (The bulk of this work was done in March 2018.)

            gpdf Gregory Dubois-Felsmann added a comment - - edited All "Level 3 -ish" requirements are collected on the linked Confluence page "Level 3 Definition and Traceability".  (The bulk of this work was done in March 2018.)

            This ticket mentions documenting the flowdown.  That work was never done in the SE model, and is now covered by the new ticket DM-18871, including flowdown to LDM-554.

            Any remaining flowdown from the full set of "Level 3" requirements to non-LSP parts of DM will be documented as part of the DM-18871 work and raised for discussion / ticketed at that time.

            gpdf Gregory Dubois-Felsmann added a comment - This ticket mentions documenting the flowdown.  That work was never done in the SE model, and is now covered by the new ticket  DM-18871 , including flowdown to LDM-554. Any remaining flowdown from the full set of "Level 3" requirements to non-LSP parts of DM will be documented as part of the DM-18871 work and raised for discussion / ticketed at that time.

            As noted in the parent epic, all this work is actually done.

            A small task of writing a road map of how the original "Level 3" ideas became various elements of the current LSP design is related to "Describe the high-level conceptual design." but will be completed under other tickets.  It does not involve any actual further design work.

            gpdf Gregory Dubois-Felsmann added a comment - As noted in the parent epic, all this work is actually done. A small task of writing a road map of how the original "Level 3" ideas became various elements of the current LSP design is related to "Describe the high-level conceptual design." but will be completed under other tickets.  It does not involve any actual further design work.

            People

              gpdf Gregory Dubois-Felsmann
              gpdf Gregory Dubois-Felsmann
              Gregory Dubois-Felsmann, Wil O'Mullane
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved:

                Jenkins

                  No builds found.