  2. DM-19977

AP pipeline development in F19A

    Details

    • Type: Epic
    • Status: Done
    • Resolution: Done
    • Fix Version/s: None
    • Component/s: None
    • Labels:
      None
    • Epic Name:
      f19a-ap-pipeline
    • Story Points:
      103.5
    • WBS:
      02C.03.04
    • Team:
      Alert Production
    • Cycle:
      Fall 2019

      Description

      This epic covers all maintenance, minor updates, and regular reprocessing of datasets, carried out on or using the AP pipeline (ap_pipe, etc) during F19A.

      It also includes work to use LSST Stack-generated calibration products (as opposed to DECam CP outputs) in our processing, and to investigate the number and type of false positives being detected during pipeline testing.

        Attachments

          Issue Links

            Activity

            Hide
            swinbank John Swinbank added a comment -

            AP pipeline QA continues on DM-21443; algorithmic development on DM-21444.

            Show
            swinbank John Swinbank added a comment - AP pipeline QA continues on DM-21443 ; algorithmic development on DM-21444 .

              People

              • Assignee:
                swinbank John Swinbank
                Reporter:
                swinbank John Swinbank
                Watchers:
                John Swinbank
              • Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:

                  Summary Panel