Uploaded image for project: 'Data Management'
  1. Data Management
  2. DM-20250

Update DM glossary to refer to the EFD as the “Engineering and Facility Database”

    Details

    • Type: Story
    • Status: Done
    • Resolution: Done
    • Fix Version/s: None
    • Component/s: lsst-texmf
    • Labels:
      None

      Description

      Per discussion on Slack, the full name of the service often referred to as “the EFD” is “the Engineering and Facility Database”, following LTS-210. Please update the DM glossary appropriately.

      (Bonus points for fixing any other documents which define the acronym without referring to the standard glossary).

        Attachments

          Activity

          swinbank John Swinbank created issue -
          swinbank John Swinbank made changes -
          Field Original Value New Value
          Resolution Done [ 10000 ]
          Status To Do [ 10001 ] Done [ 10002 ]
          swinbank John Swinbank made changes -
          Team System Management [ 12217 ] Alert Production [ 10300 ]
          swinbank John Swinbank made changes -
          Epic Link DM-19979 [ 307530 ]
          swinbank John Swinbank made changes -
          Assignee John Swinbank [ swinbank ]

            People

            • Assignee:
              swinbank John Swinbank
              Reporter:
              swinbank John Swinbank
              Watchers:
              Gregory Dubois-Felsmann, John Swinbank
            • Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved:

                Summary Panel