Uploaded image for project: 'Data Management'
  1. Data Management
  2. DM-20336

Pipeline infrastructure work by the AP team in F19A

    Details

    • Type: Epic
    • Status: Done
    • Resolution: Done
    • Fix Version/s: None
    • Component/s: None
    • Labels:
      None
    • Epic Name:
      f19a-ap-infrastructure
    • Story Points:
      96
    • WBS:
      02C.03.05
    • Team:
      Alert Production
    • Cycle:
      Fall 2019

      Description

      This epic includes AP work in F19A dedicated to:

      • Science Data Model standardization;
      • Upgrades to the Exposure class and related code;
      • Support for “Generation 3” middleware.

        Attachments

          Issue Links

          Stories in Epic (Custom Issue Matrix)

            Activity

            Hide
            swinbank John Swinbank added a comment - - edited

            Work on the Science Data Model, together with the bulk of Gen 3 porting, was postponed into F19B, and hence this epic will be closed with a lower-than-expected haul of completed SPs.

            Show
            swinbank John Swinbank added a comment - - edited Work on the Science Data Model, together with the bulk of Gen 3 porting, was postponed into F19B, and hence this epic will be closed with a lower-than-expected haul of completed SPs.

              People

              • Assignee:
                swinbank John Swinbank
                Reporter:
                swinbank John Swinbank
                Watchers:
                John Swinbank
              • Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:

                  Summary Panel