Uploaded image for project: 'Data Management'
  1. Data Management
  2. DM-2034

FY19 Setup Database for Deep Drilling

    XMLWordPrintable

    Details

    • Type: Epic
    • Status: To Do
    • Resolution: Unresolved
    • Fix Version/s: None
    • Component/s: Database
    • Labels:
      None
    • Epic Name:
      FY19 Setup Database for Deep Drilling
    • Story Points:
      53
    • WBS:
      02C.06.01.01
    • Team:
      Data Access and Database

      Attachments

        Issue Links

          Activity

          Hide
          fritzm Fritz Mueller added a comment -

          Kian-Tat Lim, Colin Slater: Well, here is an interesting one from the bug parade...  Where should one look for a "DPDD-like" description of catalog data products that the survey intends to release relating to deep drilling fields?  Will production of these products be integrated with DRP?  When might we (Qserv team) expect to first see some?

          Show
          fritzm Fritz Mueller added a comment - Kian-Tat Lim , Colin Slater : Well, here is an interesting one from the bug parade...  Where should one look for a "DPDD-like" description of catalog data products that the survey intends to release relating to deep drilling fields?  Will production of these products be integrated with DRP?  When might we (Qserv team) expect to first see some?
          Hide
          ktl Kian-Tat Lim added a comment -

          DMTN-065 suggests that special programs (which deep drilling is a subset of) should be encouraged to have "data product databases that are built with the same schema as — and can easily be joined with — the tables of the Prompt and DRP data products".

          As cadence optimization and associated special program development is ongoing, most simulated results are still some time away. DESC DC2 has a deep drilling field, but I don't know what processing, if any, has been done on it. Some precursor surveys have deeper fields.

          Show
          ktl Kian-Tat Lim added a comment - DMTN-065 suggests that special programs (which deep drilling is a subset of) should be encouraged to have "data product databases that are built with the same schema as — and can easily be joined with — the tables of the Prompt and DRP data products". As cadence optimization and associated special program development is ongoing, most simulated results are still some time away. DESC DC2 has a deep drilling field , but I don't know what processing, if any, has been done on it. Some precursor surveys have deeper fields.

            People

            Assignee:
            Unassigned Unassigned
            Reporter:
            fritzm Fritz Mueller
            Watchers:
            Fritz Mueller, Kian-Tat Lim
            Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

              Dates

              Created:
              Updated:

                Jenkins

                No builds found.