M2 Coating week 1

    XMLWordPrintable

    Details

      Description

      2nd week of observing the M2 coating.

        Attachments

          Activity

          Hide
          aheyer Andrew Heyer [X] (Inactive) added a comment -

          Looked around the chamber at the different mechanical components. Looked at the touchscreen control panel. There was a “Under voltage” error appearing on Jack 4. We tried turning off the control, resetting and starting. Tried turning off the voltage reader and back on. Now looking into it with remote connection.

          CHU - Cooling and electrical Heating system

          Water Cooling System - Degassing takes about 4 minutes. You can start it from the GUI in the control room.

          Torsen & Coworker making the pump own recipe more efficient. Unsure exactly how, it involves modifying the recipe and adding some conditions.

          Following torsten and team around while they are trying to solve the voltage problem on Jack 4. Not very useful since they are speaking German and when I ask.

          Problem seems to be coming from a vendor supplied PLC. However they do not have any PLC experts.

          Resolving the Voltage problem, putting the m2 surrogate into the coating chamber doing a test run.

          Continued working on M2 coating. Observed technicians and the control room as they were coating the witness samples. Went up with Brian to see how the DIMM is calibrated.

          Show
          aheyer Andrew Heyer [X] (Inactive) added a comment - Looked around the chamber at the different mechanical components. Looked at the touchscreen control panel. There was a “Under voltage” error appearing on Jack 4. We tried turning off the control, resetting and starting. Tried turning off the voltage reader and back on. Now looking into it with remote connection. CHU - Cooling and electrical Heating system Water Cooling System - Degassing takes about 4 minutes. You can start it from the GUI in the control room. Torsen & Coworker making the pump own recipe more efficient. Unsure exactly how, it involves modifying the recipe and adding some conditions. Following torsten and team around while they are trying to solve the voltage problem on Jack 4. Not very useful since they are speaking German and when I ask. Problem seems to be coming from a vendor supplied PLC. However they do not have any PLC experts. Resolving the Voltage problem, putting the m2 surrogate into the coating chamber doing a test run. Continued working on M2 coating. Observed technicians and the control room as they were coating the witness samples. Went up with Brian to see how the DIMM is calibrated.
          Hide
          jbuffill James Buffill [X] (Inactive) added a comment -

          Reviewed

          Show
          jbuffill James Buffill [X] (Inactive) added a comment - Reviewed
          Hide
          jbuffill James Buffill [X] (Inactive) added a comment -

          Done

          Show
          jbuffill James Buffill [X] (Inactive) added a comment - Done

            People

            Assignee:
            aheyer Andrew Heyer [X] (Inactive)
            Reporter:
            aheyer Andrew Heyer [X] (Inactive)
            Reviewers:
            James Buffill [X] (Inactive)
            Watchers:
            Andrew Heyer [X] (Inactive), James Buffill [X] (Inactive), Tomislav Vucina
            Votes:
            0 Vote for this issue
            Watchers:
            3 Start watching this issue

              Dates

              Created:
              Updated:
              Resolved:

                Jenkins

                No builds found.